Confirm a distribution or report a problem
Open the planned distribution
From the Logistics space, Distributions section.
Check the lines and assign a vehicle (optional)
Location and quantity of each line; a specific vehicle can be assigned to the distribution — restricted to the logistics coordinator.
Mark as delivered or report a problem
Once the delivery has been made in the field, confirm it, or report a problem if the material could not be delivered as planned.
Fix a mistake if needed
A distribution already marked Delivered or Problem can be "un-finalized" via Cancel finalization, as long as the material hasn't already left the depot again.
Did this page help you?